Tuesday 09/16/14

9:30 am – 1:00 am

AO demo

  • 9:30am – 12:00pm demo instruction with Rep
  • AO needs firewire connection to computer 2, can’t talk to the STORM3 computer
  • take calibration first with beads
  • 5:00pm – 6:00pm trying out sample

figure making

  • added errorbars and shaded confidence intervals for fits to figure 2.
  • functionalizing plotting commands (hopefully this makes the figure plotting code more readable and the long term figure making process faster)

chromatin data processing

This entry was posted in Summaries. Bookmark the permalink.