Friday 01/29/16

9:00 am – 7:15 pm

Meetings

  • lab meeting (see notes)

embryo staining & imaging

  • stained BX-C locus with Bit 1 (9:00 am)
  • rinsed out stain
  • broke coverslip 1 after it detached from the plastic petri dish before the the nail polish set (2 minutes was not enough)
  • started staining slide 2, 2:00 pm
  • testing stage
  • no staining (at least not near as good a last time with the 15 kb probes).
  • stained with bits 1-15 minus 3, (was going to have 3 as a cy3 control). This gives substantial nuclear background and potential faint spots.
  • maybe try more stringent wash conditions

Troubleshooting planning

  • ordered a cy3 primary (this will help troubleshoot both the probe making and the primary staining).

New stains

  • started prep of 2 new coverslips
  • ran through complete coverslip prep protocol, including Triton, LN2, Hcl and RNase. now in 50% formamide 2x SCC at 4C.

STORM5

  • steve doesn’t work: hal doesn’t save files in the correct directory with the correct name.
  • hal doesn’t save position in in the inf file. This makes tracking / returning to position quite difficult. Can use steve to record stage position.

Microscope building

  • got quotes from GE for lasers. started new Microscope building project folder
  • started excel doc to project costs. should contact Hazen.