Sunday 02/13/11

12:45 P – 7:00 P, 9:00P — 12:10 A

  • Finish confocal run (MP10, slide from 2/2/11 in situs)
  • Collect virgins from DB04 cross.
  • Analyzing new MP10 data
  • New fog- collection cage.  fog flies ready to collect virgins and cross to sna-
  • Flip collection cages, 4:30 P. Flip cages 9:00 P, Fix embryos, 9:30 P.
  • Installing numpy/scipy/matplot lib for Pyhton 2.7 snow leopard: tutorial might still be 32 bit.  This stuff is still a hopeless mess.  Try again in a few years.
  • in situs day 1A.  Protocol.
  • New confocal scan, older MP09 22C het slide (try 2).  13 images before 11A?
  • Collect virgins from DB04 crosses.
  • Clear all DB-GFP Hb[D] bottles for large virgin collection / mass crosses.
This entry was posted in Fly Work, Summaries. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *


*