Saturday 09/06/12

11:45 A – 7:15P, 8:30P – 10:30P

  • Staining microtubules in 4 colors for imaging control (with help form Graham)
  • Finish O/N STORM run of Pc-GFP with before and after 3D beads and z-calibration movies
  • Finish staining no primary controls of newly made secondaries, with co-mounted positive controls from old secondaries.
  • STORM analysis for 06/07/12 Pc-GFP data
  • errors with auto-converge z-calibration.  Rolling back previous version of code.
  • Confocal taf tub embryos
This entry was posted in Summaries and tagged . Bookmark the permalink.