Saturday 06/23/12

11:00 A -7:00P

  • Sunny’s 50th: commerative conference
  • Gene regulation session.
  • Working on snail manuscript
  • analyzing MT data.
  • Overwrote Bead1 data with Bead2 acquisitions…
  • Instability in z-calibration: uncertainty bounds of zr and other parameters increase with iterations instead of decrease!
  • Load zcal mollists and plot ave (z) position after tilt correction as a function of time as a way of testing fit (this is probably already being plotted)
  • 40 nm 540 beads bleach in first few frames.  Need to change substantially imaging conditions.  Use low laser power, fit quality still good (Ke).
This entry was posted in Summaries. Bookmark the permalink.