Friday 06/22/12

10:30 A – 5:30, 8:30-11:30P

  • Make new bead slide with 40 nm 540 beads and 100 nm IR beads.
  • Finish O/N STORM run and shoot beads.
  • Fixed issue with 3D bead mapping not mapping IR and Vis 647 channels together.
  • STORM imaging of Ubx-r AbdB-g
  • forgot to increase 750 back to 40 Amps, 750 switching slow.  Also left 647 at 110 mW. 🙁
  • STORM imaging microtubules
This entry was posted in Summaries and tagged . Bookmark the permalink.