Monday 09/10/12

9:40 A – 5:00P, 8:15P – 11:00P

  • Restart data run on Tuck
  • Transfer files from STORM4 (en STORM from 9/6… oops).
  • Etching slide S6 for imaging today.
  • Move ND filter 5 from STORM2 750 line to STORM4.
  • Colenso also notices switching issues with 647 channel but not others.  Possible power density issue?
  • STORM imaging of s6: E5 + AbdB (AbdB-488 not working well). 750 not switching as robustly as in previous samples.
  • Running STORM analysis of AbdA data (8/25/12)  and Pc data on Tuck.
  • Yari wants full resources on Tuck for tomorrow, cancelled all Matlab ques to InsightM, hopefully most existing movies in process finish before tomorrow morning.
  • Tuck update: 3 premature terminations (at frame 18,937 with 258,252 molecules found).  Not a molecule number limit (I think that is 4 million, and some are still going fine at 480,000).  4 almost done (frame 100,000+ of 120,000).  This is probably a sluggish switching problem.
  • working on Dfd summary figures
  • O/N STORM imaging of E5-Cy3B/AbdB-488 slide (s6).  647 providing good low background switching but switching slowly (Taking 60,000 frames, could probably due longer.
  • Cajal also had  about 10 movies crash InsightM. Probably system hit memory limit during acquisition which caused termination.  Cajal is almost maxed out (CPU going at 60-70%).  Just finished 750storm analysis hasn’t started 647storm (ran a few 647conv, shoud rewrite code to skip short dax files or things with conv in the name…).
This entry was posted in Summaries and tagged , . Bookmark the permalink.