STORM3

STORM 3 setup notes

  • 561 line: Com 8, up to 100 mW at detector when running at 300 mW at laser.  Controlled by AOTF
  • 656 red line.  Power switch on tabel, modulated by AOTF.  up 100 mW at detector: mirrors behind waveguide is unaligned easily, tweak to correct power.
  • Setup TIRF — electronic TIRF control through computer.  Press >> 3x to TIRF for standard TIRF (20.660 at meter).
  • IR takes 30+ seconds to warm up after triggering the ‘On’ switch in the computer interface in Hal software.  Turn on early for ease of operation.
This entry was posted in Microscopy and tagged . Bookmark the permalink.