Saturday 06/01/13

10:00 A – 12:15 P, 3:00 P – 7:00 P

STORM

  • finish O/N STORM run. VALAP seal did not work as well this time — substantial air bubble in sample, switching not over airbubble but background is up and signal way down.
  • recovered slide. Will see if fresh imaging buffer leads to renewed good switching

coding

  • working on Ph analysis script

STORM

  • Set up O/N imaging of black DNA
  • spent 1.5 hours trying to get VALAP to seal effectively and not obscure access of lens to sample
  • Small bubble evident after 2 hours of imaging setup
  • still switching well at midnight.
  • (5 movies later buffer is deteriorated past usable imaging).

To do

  • image en-labeled embryo prior to staining.
This entry was posted in Summaries. Bookmark the permalink.