Tag Archives: STORM2

Tuesday 04/29/14

9:30a – 10:00p Computer Cajal troubleshooting computer behaving very sluggish today, denying connections restarted Cajal. also removed all the memory DIMMs and reinstalled them. Cajal now recognizes 48 GB of RAM again (instead of just 24 GB). Project 2 moved … Continue reading

Posted in Summaries | Tagged , , | Comments Off on Tuesday 04/29/14

Wednesday 12/11/13

11:15a – 11:45p Ph Project Highly variable radius of gyration measurements for case with binding — suggests not equilbirated. Binding strength probably much to high. Up to .90, run again. Also increased density of K27me3 sites from 50% to 80%, … Continue reading

Posted in Summaries | Tagged , , , , | Comments Off on Wednesday 12/11/13

STORM2 BX-C 01/23/13

Setup Back-optics aligned Focus lock working Laser power: 647 laser at 200 mW source: 130 mW at power meter 405 laser: max power = 1.89 mW.  10% = .09 mW z-stage drift without focus lock is ~800 nm per min … Continue reading

Posted in General STORM | Tagged | Comments Off on STORM2 BX-C 01/23/13

Sunday 12/09/12

10:20 A – 7:30P, 9:30-11:00P STORM 750 1600 mA = 18 mW 1.45 mW 405 200 mW set 647 Made new Glox 750 not switching well.  Not sure if it’s just low labeling (405 looked okay but not strong). 647 … Continue reading

Posted in Summaries | Tagged , , , , , | Comments Off on Sunday 12/09/12

Monday 11/19/12

9:15 A — 7:15 P, 8:15P – 1:15 A Cell labeling hot washes for probe first slide (2x at 60C) 1x at RT remove and save primary antibodies at RT for primary first slide. PBT rinses (3x soln change, 3rd … Continue reading

Posted in Fly Work, probe and plasmid building, Summaries | Tagged , , , | Comments Off on Monday 11/19/12

STORM2 rebuild SOP

  Follow text file SOP for 750 laser. Aligning back optics place microscope in epi mode (12.000) Course tuning remove 20x, 100x objectives. screw in target objective in 100x objective position. remove final lens before scope body, add iris in … Continue reading

Posted in General STORM | Tagged , , | Comments Off on STORM2 rebuild SOP