Author Archives: admin

Protected: group meeting 03/04/13

There is no excerpt because this is a protected post.

Posted in Lab Meeting | Comments Off on Protected: group meeting 03/04/13

Sunday 03/03/13

10:00A – 1:00P, 6:00P – 7:45P, 9:00P – 11:00P Embryo Section staining Control test with AATAT worked. basic protocol No 92C pre-denature 60C 25 min minimal cooling gap. Add probe to slide, drop coverglass on, seal 94C heat-block 2.5 min … Continue reading

Posted in Summaries | Tagged , | Comments Off on Sunday 03/03/13

Saturday 03/02/13

10:00A – 7:00P, 8:30P-10:30P Writing stuff Revised Banff Invites letter sent to co-organizers write to van Steensel about R code Review/referee article read clean through manuscript wrote up all critiques. To do: write up manuscript strengths and contributions to field. … Continue reading

Posted in Summaries | Tagged , | Comments Off on Saturday 03/02/13

Updating Web Notebook: version management

Methods for version management: WP Document Revisions adds a new tab to main side widget (below Pages and Comments), called Documents. Under this tab you can upload files from your computer. These now behave has posts. Instead of editing the … Continue reading

Posted in Research Planning | Tagged , | Comments Off on Updating Web Notebook: version management

Friday 03/01/13

8:10 A – 8:10P, 9:30P – 11:00P Confocal helping scan Hazen’s sections Embryo section staining BXC DFISH NO BX-C staining detectable after post-hybe hot-wash (50-60C in waterbath, 25 min). Repeat staining, try short coldwash and then check cells for signal. … Continue reading

Posted in Summaries | Tagged , , | Comments Off on Friday 03/01/13

Failures update

Fly Genetics Failed knockdown: 2x Mat alpha tub driving any of the TRiP valium 20 or valium 22 PcG target shRNAs. Gives viable F1 and F2s or infertile F2s. No PcG phenotypes. Kill all current crosses Kill all expanding Gal4 … Continue reading

Posted in Chromatin, Research Planning | Tagged , , | Comments Off on Failures update

Demo Gist-based version management

Protocol: Oligo Paint Synthesis permalink to most recent version. permalink to the version as it stood when this demo was published on 03/21/13. Gist embedded version of date-specific permalink using native Gist embed interpreter for markdown: [easyembed field=”Gist1″]

Posted in Protocols | Comments Off on Demo Gist-based version management

demo: version managed pdf protocol

Protocol Qiagen Miniprep (QIAprep) Latest Updated version. Date specific version

Posted in Protocols | Comments Off on demo: version managed pdf protocol

Thursday 02/28/13

10:20 A -6:45P, 8:15P – 11:55P (workout 8:30-10:20A) Probe Making (1P-6P @ Longwood) emPCR for 100kb yellow, green and black regions (at Wu lab) see new protocol 35-50 ng/uL yield (11 uL total volume) Notebook Looking in to version managing … Continue reading

Posted in Summaries | Tagged , , | Comments Off on Thursday 02/28/13

Large Scale PCR for probe synthesis

Part 1 – PCR amplification Notes: We recommend setting up 10 ml of PCR master mix and aliquoting it into a 96-well plate, 100 µl per well. This protocol is scaled for a starting amount of 10 ml; simply scale … Continue reading

Posted in Protocols | Comments Off on Large Scale PCR for probe synthesis